石油学报 ›› 2006, Vol. 27 ›› Issue (4): 101-104.DOI: 10.7623/syxb200604023

• 油田开发 • 上一篇    下一篇

鱼骨井产能预测及分支井形态优化

范玉平1,3, 韩国庆2, 杨长春1   

  1. 1. 中国科学院地质与地球物理研究所, 北京, 100029;
    2. 中国石油大学石油天然气工程学院, 北京, 102249;
    3. 中国石油辽河油田兴隆台采油厂, 辽宁盘锦, 124010
  • 收稿日期:2005-08-31 修回日期:2005-11-29 出版日期:2006-07-25 发布日期:2010-05-21
  • 作者简介:范玉平,男,1965年8月生,1987年毕业于石油大学(华东),现为中国石油辽河油田公司兴隆台采油厂厂长,高级工程师,在读博士研究生,主要从事石油工程方面的研究.E-mail:Fanyuping123@sohu.com
  • 基金资助:
    中国石油天然气集团公司石油科技中青年创新基金项目(04E7033)部分成果.

Production forecast for herringbone well and optimum configuration of lateral holes

Fan Yuping1,3, Han Guoqing2, Yang Changchun1   

  1. 1. Institute of Geology and Geophysics, Chinese Academy of Sciences, Beijing 100029, China;
    2. Faculty of Petroleum Engineering, China University of Petroleum, Beijing 102249, China;
    3. Xinglongtai Oil Production Plant, PetroChina Liaohe Oilfield Company, Panjin 124010, China
  • Received:2005-08-31 Revised:2005-11-29 Online:2006-07-25 Published:2010-05-21

摘要: 针对鱼骨井的特点,建立了半解析产能预测模型,并编制了相应软件.该模型能用于预测任意分支井的流入剖面和井筒内及井筒周围的压力分布.现场与电模拟实验结果表明,该模型具有较高的预测精度.利用该模型对鱼骨井的分支数、分支角度影响产能的分析结果表明,分支角度大于45°后鱼骨井总产能增加不大;分支数越多,对主井筒的影响越大.在总钻井长度一定的情况下,分支数不应超过3支,鱼骨井分支在主井筒的同侧比在异侧对产量的贡献大.

关键词: 鱼骨井, 产能预测, 半解析模型, 分支形态, 压力分布, 电模拟实验

Abstract: According to the characteristics of herringbone well,a semi-analytical model for production prediction was established.This model can be used to predict the inflow profile of arbitrary lateral hole and the pressure distribution inner hole and around hole.The data of field pilot and electrical simulation experiment indicate that the forecasting precision of this model is good.The effects of number and angle of lateral hole on the production of herringbone well were analyzed by this model.The result indicates that a little increase of total production of lateral holes would be gained when the lateral angle is over 45 degrees.Large number of lateral hole has a great effect on the production of main wellbore.The number of lateral hole should not be more than three under given horizontal length.The higher production can be obtained when all lateral holes are set on the same side of the main wellbore.

Key words: herringbone well, production forecast, semi-analytical model, lateral configuration, pressure distribution, electrical simulation experiment