石油学报 ›› 2006, Vol. 27 ›› Issue (2): 125-128.DOI: 10.7623/syxb200602027

• 石油工程 • 上一篇    下一篇

基于模糊综合评判法的地下储气库方案优选

苏欣1, 赵宏涛2, 袁宗明1, 臧国军2, 胡安鑫1, 张琳1   

  1. 1. 西南石油大学石油工程学院, 四川, 成都, 610500;
    2. 中国石油长庆油田分公司第一输油处, 陕西, 西安, 71000
  • 收稿日期:2005-06-02 修回日期:2005-08-17 出版日期:2006-03-25 发布日期:2010-05-21
  • 作者简介:苏欣,男,1982年1月生,2004年毕业于西南石油学院油气储运专业,现在西南石油大学攻读油气储运专业硕士学位,主要研究方向为油气管道仿真.E-mail:sx124@126.com
  • 基金资助:
    四川省重点学科建设(SZD0416)资助项目

Optimum method for underground gas storage projects based on fuzzy comprehensive evaluation

Su Xin1, Zhao Hongtao2, Yuan Zongming1, Zang Guojun2, Hu Anxin1, Zhang Lin1   

  1. 1. Faculty of Petroleum Engineering, Southwest Petroleum university, Chengdu 610500, China;
    2. Transportation section No.1, Petrochina Changqing Oilfield company, Xi'an 71000, China
  • Received:2005-06-02 Revised:2005-08-17 Online:2006-03-25 Published:2010-05-21

摘要: 地下储气库的设计方案涉及因素多,必须对方案从整体上进行综合评价,建立正确的决策模型,从而客观合理确定优选方案.介绍了改进层次分析法及模糊综合评价法的原理,提出了将改进层次分析法和模糊综合评价相结合的决策模型.将该决策模型应用于北京某地下储气库方案优选,在优选过程中考虑了影响地下储气库建设方案的8个主要因素,对备选的6个方案建立了“优、良、中、差”4个评价等级,利用改进的层次分析法确定了各因素的权重,并对各方案进行了模糊综合评价.结果表明该决策模型所选方案与实际所选方案一致,说明了该决策模型的适用性.

关键词: 改进层次分析法, 模糊综合评价法, 地下储气库, 设计方案, 决策模型

Abstract: There are many factors involved in the design projects of underground gas storages.Therefore,it is necessary to establish a right decision model to comprehensively evaluate the design projects.The procedures of the improved analytic hierarchy process and the principles of fuzzy comprehensive evaluation were briefly introduced.The decision model combined by the improved analytic hierarchy process and fuzzy comprehensive evaluation was applied to the optimization of projects for some underground gas storage in Beijing.Eight main factors involving the construction of the underground gas storage were considered during the whole optimization process.Four assessment grades for six projects were established,including extraordinary,good,ordinary and bad.Then the weights of all factors were determined,and the fuzzy comprehensive evaluation of each project was conducted.The project selected by this decision model matches the applied project on-site,which shows the applicability of this model.

Key words: improved analytic hierarchy process, fuzzy comprehensive evaluation, underground gas storage, design project, decision model