[1] 苏义脑.地质导向钻井技术概况及其在我国的研究进展[J].石油勘探与开发,2005,32(1):92-95.
SU Yinao.Geosteering drilling technology and its development in China[J].Petroleum Exploration and Development,2005,32(1):92-95.
[2] 苏义脑.井下控制工程学概述及其研究进展[J].石油勘探与开发,2018,45(4):705-712.
SU Yinao.Introduction to the theory and technology on downhole control engineering and its research progress[J].Petroleum Exploration and Development,2018,45(4):705-712.
[3] 王宏博,董世民,甘庆明,等.低产抽油机井动态参数仿真模型与提高系统效率的途径[J].石油学报,2018,39(11):1299-1307.
WANG Hongbo,DONG Shimin,GAN Qingming,et al.Dynamic parameter simulation model of low-production pumping well and the ways to improve system efficiency[J].Acta Petrolei Sinica,2018,39(11):1299-1307.
[4] 程贤箬,程为彬,高怡,等.垂直姿态位置误差的虚拟正交建模与均衡补偿[J].石油学报,2017,38(7):840-845.
CHENG Xianruo,CHENG Weibin,GAO Yi,et al.Virtual orthogonal modeling of vertical-posture position error and isostatic compensation[J].Acta Petrolei Sinica,2017,38(7):840-845.
[5] 唐宁,王少萍,洪迪峰.井眼测量误差椭球最小间距计算方法[J].石油学报,2017,38(11):1320-1325.
TANG Ning,WANG Shaoping,HONG Difeng.A calculation method of minimum distance between wellbore survey error ellipsoids[J].Acta Petrolei Sinica,2017,38(11):1320-1325.
[6] WILLIAMSON H S.Towards risk-based well separation rules[J].SPE Drilling & Completion,1998,13(1):47-51.
[7] SAWARYN S J,WILSON H,BANG J,et al.Well collision avoidance-separation rule[R].SPE 187073,2017.
[8] POEDJONO B,PHILLIPS W J,LOMBARDO G J.Anti-collision risk management standard for well placement[R].SPE 121040,2009.
[9] SAWARYN S J.Well collision avoidance management and principles[R].SPE 184730,2017.
[10] Brooks A G.A new look at wellbore-collision probability[J].SPE Drilling & Completion,2010,25(2):223-229.
[11] OKEWUNMI S,BROOKS A G.A comparison of collision avoidance calculations[R].SPE 140183,2011.
[12] DE WARDT J P,MULLIN S,THOROGOOD J L,et al.Techbits:Wellbore collision avoidance and interceptions-state of the art[J].Journal of Petroleum Technology,2013,65(3):42-50.
[13] 史玉才,张晨,薛磊,等.井眼分离系数计算新方法[J].石油学报,2015,36(12):1580-1585.
SHI Yucai,ZHANG Chen,XUE Lei,et al.A new calculation method of wellbore separation factor[J].Acta Petrolei Sinica,2015,36(12):1580-1585.
[14] 唐宁,王少萍,洪迪峰.井眼测量误差椭球最小间距计算方法[J].石油学报,2017,38(11):1320-1325.
TANG Ning,WANG Shaoping,HONG Difeng.A calculation method of minimum distance between wellbore survey error ellipsoids[J].Acta Petrolei Sinica,2017,38(11):1320-1325.
[15] 刘修善.基于地球椭球的真三维井眼定位方法[J].石油勘探与开发,2017,44(2):275-280.
LIU Xiushan.A true three-dimensional wellbore positioning method based on the earth ellipsoid[J].Petroleum Exploration and Development,2017,44(2):275-280.
[16] 刘修善,祁尚义,刘子恒.法面扫描井间距离的解析算法[J].石油钻探技术,2015,43(2):8-13.
LIU Xiushan,QI Shangyi,LIU Ziheng.Analytical algorithm for normal-plane scanning of interwell distance[J].Petroleum Drilling Techniques,2015,43(2):8-13.
[17] 夏泊洢.邻井法面距离计算方法的改进[J].石油地质与工程,2012,26(5):113-116.
XIA Boyi.Perfegtion of calculating normal plane distance between[J].Petroleum Geology and Engineering, 2012,26(5):113-116.
[18] 唐雪平.一种精确的井距计算方法[J].数学的实践与认识,2012,42(17):69-78.
TANG Xueping.An exact well distance calculation method[J].Mathematics in Practice and Theory,2012,42(17):69-78.
[19] 鲁港,常汉章,邢玉德,等.邻井间最近距离扫描的快速算法[J].石油钻探技术,2007,35(3):23-26.
LU Gang,CHANG Hanzhang,XING Yude,et al.Fast algorithm for scanning the nearest distance among adjacent wells[J].Petroleum Drilling Techniques,2007,35(3):23-26.
[20] SAWARYN S J,JAMIESON A L,MCGREGOR A E.Explicit calculation of expansion factors for collision avoidance between two coplanar survey-error ellipses[J].SPE Drilling & Completion,2013,28(1):75-85.
[21] 刘修善.井眼轨迹不确定性表征方法[J].石油勘探与开发,2019,46(2):391-396.
LIU Xiushan.Borehole trajectory uncertainty and its characterization[J].Petroleum Exploration and Development,2019,46(2):391-396.
[22] 刘修善,岑章志.井眼轨迹间相互关系的描述与计算[J].钻采工艺,1999,22(3):7-12.
LIU Xiushan,CEN Zhangzhi.Description and calculation of relative positions of wellbore trajectories[J].Drilling & Production Technology,1999,22(3):7-12.
[23] 刘修善,苏义脑.邻井间最近距离的表述及应用[J].中国海上油气(工程),2000,12(4):31-34.
LIU Xiushan,SU Yinao.Description and application of minimum distance between adjacent wells[J].China Offshore Oil and Gas (Engineering),2000,12(4):31-34. |