[1]赵贤正,赵政璋,李景明,等.中国陆上天然气资源的特征及发展策略[J].石油学报,2004,25(5):1-5.
Zhao Xianzheng,Zhao Zhengzhang,Li Jingming,et al.Characteristics and development strategy of onshore natural gas resources in China[J].Acta Petrolei Sinica,2004,25(5):1-5.
[2]卢双舫,王朋岩,付广,等.从天然气富集的主控因素剖析我国主要含气盆地天然气的勘探前景[J].石油学报,2003,24(3):34-37.
Lu Shuangfang,Wang Pengyan,Fu Guang,et al.Exploration potential analysis of natural gas in the main gas-bearing basins based on factors controlling natural gas enrichment[J].Acta Petrolei Sinica,2003,24(3):34-37.
[3]张彬.预应力LNG储罐混凝土外墙地震响应分析[D].大庆:大庆石油学院,2009.
Zhang Bin.Analysis on the exteroir walls of the prestressed concrete LNG storage tank under seismic response[D].Daqing:Daqing Petroleum Institute,2009.
[4]柳山.液化天然气(LNG)全容储罐结构和性能研究[D].广州:华南理工大学,2009.
Liu Shan. Study on structure and performance of LNG full containment tank[D].Guangzhou:South China University of Technology, 2009.
[5]胡见义,陈英,郑俊章.东北亚天然气资源及其发展趋势[J].石油学报,2003,24(1):1-8.
Hu Jianyi,Chen Ying,Zheng Junzhang.Natural gas resources and its development trend in Northeast Asia[J].Acta Petrolei Sinica, 2003, 24(1): 1-8.
[6]Thiagarajan K P,Rakshit D,Repalle N.The air-water sloshing problem:fundamental analysis and parametric studies on excitation and fill levels[J].Ocean Engineering,2011,38(2/3):498-508.
[7]Chardome V,Verhagen B.Development of a procedure for the ultrasonic examination of 9% nickel LNG storage tank welds using phased array technology[J].Insight-Non-Destructive Testing and Condition Monitoring,2008,50(9):490-491.
[8]Myung W S,Dongil S,Soo H C,et al.Optimal operation of the boil-off gas compression process using a boil-off rate model for LNG storage tanks[J].Korean Journal of Chemical Engineering,2008,25(1):7-12.
[9]Amiya K S,Balaram B,Simha S.An investigation of cylindrical wall of reinforced concrete LNG tank subjected to transverse shear due to wind[J].The IUP Journal of Structural Engineering,2011,7(2):33-49.
[10]程旭东,朱兴吉,胡晶晶,等.LNG储罐预应力混凝土外罐应力分布与裂缝形态[J].油气储运,2011,30(10):746-749.
Cheng Xudong,Zhu Xingji,Hu Jingjing,et al.Analysis of stress and crack of prestressed concrete wall of large LNG storage tanks[J].Oil & Gas Storage and Transportation,2011,30(10):746-749.
[11]王润富,陈国荣.温度场和温度应力[M].北京:科学出版社,2005:92-96.
Wang Runfu,Chen Guorong.Temperature field and thermal stress[M].Beijing:Science Press,2005:92-96.
[12]魏会东,周美珍,颜世忠,等.LNG储罐主容器泄漏时外罐壁的传热特性[J].低温工程,2009(6):57-61.
Wei Huidong,Zhou Meizhen,Yan Shizhong,et al.Investigation of heat transfer in outer tank wall during LNG storage tank primary container’s leakage[J].Cryogenics,2009(6):57-61.
[13]Chung Kyun Kim.On the leakage analysis of a full containment tank using a FEM[J].KSTLE International Journal,2006,7(1):45-50.
[14]杨世铭,陶文铨.传热学[M].北京:高等教育出版社,2000:33-34.
Yang Shiming,Tao Wenquan.Heat transfer[M].Beijing:Higher Education Press,2000:33-34.
[15]程旭东,朱兴吉,胡晶晶.大型LNG储罐预应力混凝土外墙应力分析与结构优化[J].油气储运,2011,30(11):819-823.
Cheng Xudong,Zhu Xingji,Hu Jingjing.Stress analysis and structure optimization for pre-stressed concrete exterior wall of large-scale LNG storage tank[J].Oil & Gas Storage and Transportation,2011,30(11):819-823.
[16]帅健,于桂杰.管道及储罐强度设计[M].北京:石油工业出版社,2006:190-194.
Shuai Jian,Yu Guijie.Strength design of pipelines and storage tanks[M].Beijing:Petroleum Industry Press,2006:190-194.
[17]王伟玲.大型LNG预应力储罐静力荷载下受力性能研究[D].大庆:大庆石油学院,2009.
Wang Weiling.Study on behavior of large liquefied natural gas prestressed concrete storage tank under static load[D].Daqing:Daqing Petroleum Institute,2009.
[18]苏娟,周美珍,余建星,等.泄露工况下大型LNG预应力混凝土储罐低温分析[J].低温工程,2010(4):47-52.
Su Juan,Zhou Meizhen,Yu Jianxing,et al.Low temperature analysis of LNG prestressed concrete tank for spill conditions[J].Cryogenics,2010(4):47-52. |