THE REASONABLE TIME OF OPENING WELL OR FORMATION WITH HIGH WATER CUT UNDER POLYMER FLOODING
YIN Dai-yin
Editorial office of ACTA PETROLEI SINICA . 2000, (6): 61 -66 .  DOI: 10.7623/syxb200006011