WANG Qing LIU Huiqing ZHANG Hongling ZHENG Jiapeng. An optimization model of completion strings with inner-located nozzle in horizontal wells coupled with reservoirs[J]. Editorial office of ACTA PETROLEI SINICA, 2011, 32(2): 346-349.
Li Yanxing,Han Lingchun,Dong Pingchuan,et al.Study on economic limits for horizontal well in low-permeability reservoir[J].Acta Petrolei Sinica,2009,30(2):242-246.
Li Yikun,Hu Pin,Feng Jilei,et al.Background,current situation and trend of development for water shutoff in horizontal wells[J].Journal of Oil and Gas Technology,2005,27(5):757-760.
Liu Shan,Tong Dengke.Optimization models of separated production scheme in horizontal wells based on reservoir-wellbore coupling[J].Acta Petrolei Sinica,2009,30(6):932-936.
Liu Xiangping,Zhang Zhaoshun,Liu Xiang’e,et al.A model to calculate pressure drops of horizontal wellbore variable mass flow coupled with flow in a reservoir[J].Journal of Southwest Petroleum Institute,2000,22(2):36-39.
[8]Ouyang L B,Aziz K.A general single-phase wellbore/reservoir coupling model for multilateral wells[R].SPE 72467,2001.