Editorial office of ACTA PETROLEI SINICA ›› 1995, Vol. 16 ›› Issue (3): 123-128.DOI: 10.7623/syxb199503019
• Petroleum Engineering • Previous Articles Next Articles
Liu Yushi1, Bai Jiazhi1, Zhou Yihui1, Huang Rongzun2
Received:
Revised:
Online:
Published:
刘玉石1, 白家祉1, 周煜辉1, 黄荣樽2
作者简介:
Abstract: One of the methods to keep wellbore stability during drilling is to select the proper muddensity.In this paper the stress around a deviated wellbore was analyzed according to the Mohr-Coulomb failure criterion when considering the strain soft character of damaged rockmaterials.
Key words: damage wellbore stability well pressure drilling mud density
摘要: 钻井施工中保持并眼稳定的措施之一是确定合适的钻井液密度.本文采用摩尔-库仑屈服条件,考虑材料损伤后的应变软化特性,对井壁岩石进行力学分析,给出维持井壁稳定的泥浆密度.
关键词: 损坏, 井眼稳定, 井压力, 钻井液, 密度
Liu Yushi, Bai Jiazhi, Zhou Yihui, Huang Rongzun. MUD DENSITY FOR WELLBORE STABILITY WHEN FORMATION ROCK IS DAMAGED[J]. Editorial office of ACTA PETROLEI SINICA, 1995, 16(3): 123-128.
刘玉石, 白家祉, 周煜辉, 黄荣樽. 考虑井壁岩石损伤时保持井眼稳定的泥浆密度[J]. 石油学报, 1995, 16(3): 123-128.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.syxb-cps.com.cn/EN/10.7623/syxb199503019
https://www.syxb-cps.com.cn/EN/Y1995/V16/I3/123