Editorial office of ACTA PETROLEI SINICA ›› 1992, Vol. 13 ›› Issue (3): 109-117.DOI: 10.7623/syxb199203015
• Petroleum Engineering • Previous Articles Next Articles
Zhou Daqian, Gu Lingdi, Liu Xiushan, Qi Lin
Received:
Online:
Published:
周大千, 顾玲弟, 刘修善, 齐林
作者简介:
Abstract: This paper sammarizes the mathematical models of the obstructions which are often encountered in cluster-directional well drilling designs,It is shown that they can be summarized in to 3 types: thin vertical circular cone,ring,and inclined frustum,and cylinder.It further analyses the necessity of bypassing the obstructions,derives criteria of bypassing under different conditions,and presents a new 3-D design method of bypassing the obstructions-the inclined plane-trial-and-error method.A design example is given also.
摘要: 归纳丛式定向井设计中常见障碍物的数学模型有细直圆锥、圆环加斜圆台和空间圆柱三种.分析了绕障设计的必要性,得出在各种障碍物条件下绕障必要性的判断关系式.提出一种新的三维绕障定向井设计方法——斜平面试算法,并给出了设计实例.
关键词: 丛式定向井, 障碍物, 绕障必要性, 设计方法
Zhou Daqian, Gu Lingdi, Liu Xiushan, Qi Lin. A NEW 3-D DESIGN METHOD FOR BYPASSINGOBSTRUCTIONS FOR CLUSTER-DIRECTIONAL WELLS[J]. Editorial office of ACTA PETROLEI SINICA, 1992, 13(3): 109-117.
周大千, 顾玲弟, 刘修善, 齐林. 一种三维绕障定向井设计新方法[J]. 石油学报, 1992, 13(3): 109-117.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.syxb-cps.com.cn/EN/10.7623/syxb199203015
https://www.syxb-cps.com.cn/EN/Y1992/V13/I3/109