Editorial office of ACTA PETROLEI SINICA ›› 1986, Vol. 7 ›› Issue (3): 49-56.DOI: 10.7623/syxb198603007
• Oil Field Development • Previous Articles Next Articles
Hu Futang
Received:
Online:
Published:
胡福堂
Abstract: Water injection for maintenance of reservoir pressure has been employed for 25 years in a conglomerate reservoir of Karamay field.Because of waterflooding the reservoir remains in flow production and the current recovery ratio is close to 47%.The estimated ultimate recovery ratio may reach 45%.Experiences in adjustment of injection-production pattern,means of pressure maintenance and control of injection and withdrawal rate are presented in this paper.
摘要: 克拉玛依油田七东区砾岩油藏,注水开发已经25年,一直保持压力自喷开采,目前采出程度接近40%,预测最终采收率可达45%.本文从注采系统的调整、压力保持方法、注采速度的控制,以及开发调整方面作了经验介绍.
Hu Futang. DEVELOPMENT OF CONGLOMERATE OIL RESERVOIR BY WATERFLOODING IN KARAMAY OIL FIELD[J]. Editorial office of ACTA PETROLEI SINICA, 1986, 7(3): 49-56.
胡福堂. 克拉玛依油田砾岩油藏注水开发[J]. 石油学报, 1986, 7(3): 49-56.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.syxb-cps.com.cn/EN/10.7623/syxb198603007
https://www.syxb-cps.com.cn/EN/Y1986/V7/I3/49