[1]Johnston D.International exploration economics,risk,and contract analysis[M].Tulsa:PennWell Books,2003.
[2]葛艾继,郭鹏,许红.国际油气合作理论与实务[M].北京:石油工业出版社,2004.
Ge Aiji,Guo Peng,Xu Hong.Theory and practice of oil and gas cooperation[M].Beijing:Petroleum Industry Press,2004.
[3]Blake A J,Roberts M C.Comparing petroleum fiscal regimes under oil price uncertainty[J].Resources Policy,2006,31(2):95-105.
[4]Wang Zhen,Liu Mingming,Zhao Lin.Impacts of R/T elements on contracts economics under oil price uncertainty:the 1st International Conference on Sustainable Construction & Risk Management,Chongqing,June 12-14,2010[C].Chongqing:Chongqing Jiaotong University Press,2010.
[5]罗东坤,闫娜.国际石油合同财税条款评价方法[J].石油勘探与开发,2010,37(6):756-762.
Luo Dongkun,Yan Na.Assessment of fiscal terms of international petroleum contracts[J].Petroleum Exploration and Development,2010,37(6):756-762.
[6]陈洪涛,周德群,王群伟.石油金融理论研究评述[J].经济学动态,2008(7):99-105.
Chen Hongtao,Zhou Dequn,Wang Qunwei.Review of oil finance theory[J].Economic Perspectives,2008(7):99-105.
[7]林敏,刘志斌.油价系统的随机模拟[J].系统工程,2008,26(2):72-77.
Lin Min,Liu Zhibin.Stochastic simulation on the system of oil price[J].System Engineering,2008,26(2):99-105.
[8]Schwartz E S.The stochastic behavior of commodity prices:implications for valuation and hedging[J].The Journal of Finance,1997,52(3):923-973.
[9]Wang Zhen,Li Liangjun.Valuation of the flexibility in decision-making for revamping installations:a case from fertilizer plants[J].Petroleum Science,2010,7(3):428-434.
[10]Wang Zhen,Zhao Lin,Liu Mingming.Impacts of PSC elements on contracts economics under oil price uncertainty:2010 International Conference on E-business and E-Government,Guangzhou,May 7-9,2010[C].Guangzhou:South China University of Technology Press,2010.
[11]赵林,冯连勇.未开发油田价值评估和投资时机选择模型的构建及应用[J].中国石油大学学报:自然科学版,2009,33(6):161-166.
Zhao Lin,Feng Lianyong.Establishment and application of evaluation and investment timing model for undeveloped oilfield[J].Journal of China University of Petroleum:Edition of Natural Science,2009,33(6):161-166.
[12]Hull J C.Options,futures and other derivative securities[M].4th ed.New Jersey:Prentice Hall,2000.
[13]Davis G A.Estimating volatility and dividend yield when valuing real options to invest or abandon[J].The Quarterly Review of Economics and Finance,1998,38(3):725-754.
[14]Dixit A K,Pindyck R S.Investment under uncertainty[M].Princeton:Princeton University Press,1994.
[15]张宏亮,王其文.投资项目风险模拟分析中样本量的决定方法[J].系统工程理论与实践,2004(2):14-18.
Zhang Hongliang,Wang Qiwen.Sample size determination methods for simulation in the risk analysis of investment projects[J].Systems Engineering-Theory & Practice,2004(2):14-18.
[16]姚军,王子胜,张允,等.天然裂缝性油藏的离散裂缝网络数值模拟方法[J].石油学报,2010,31(2):284-288.
Yao Jun,Wang Zisheng,Zhang Yun,et al.Numerical simulation method of discrete fracture network for naturally fractured reservoirs[J].Acta Petrolei Sinica,2010,31(2):284-288.
[17]董世民,张喜顺,吴长杰,等.抽油机井区块整体节能参数仿真优化方法[J].石油学报,2010,31(3):475-479.
Dong Shimin,Zhang Xishun,Wu Changjie,et al.Simulation and optimization method for the integral energy-saving suction parameters of rod pumping wells in an oilfield[J].Acta Petrolei Sinica,2010,31(3):475-479.
[18]李少华,张昌民,Deutsch C V.基于储层静态地质参数的一种随机建模结果排序方法[J].石油学报,2010,31(3):445-448.
Li Shaohua,Zhang Changmin,Deutsch C V.Ranking realizations of stochastic modeling based on reservoir static geological parameters[J].Acta Petrolei Sinica,2010,31(3):445-448. |