Editorial office of ACTA PETROLEI SINICA ›› 1995, Vol. 16 ›› Issue (1): 79-87.DOI: 10.7623/syxb199501011

• Oil Field Development • Previous Articles     Next Articles

A NEW MODEL TO PREDICT PRODUCTION RATE OF OILAND GAS FIELDS

Hu Jianguo1, Chen Yuanqian2, Zhang Shengzong2   

  1. 1. Research Instilule of Changqing Exploration and Development;
    2. Scientific Research Institute of Petroleum Exploration and Development, Beijing
  • Received:1992-09-16 Revised:1994-06-07 Online:1995-01-25 Published:2013-07-08

预测油气田产量的新模型

胡建国1, 陈元千2, 张盛宗2   

  1. 1. 长庆石油勘探开发研究院;
    2. 石油勘探开发科学研究院 北京
  • 作者简介:胡建国,1990年毕业于石油大学(函授).现任长庆石油勘探开发研究院工程师.通讯处:甘肃省庆阳县.邮政编码:745101.

Abstract: Based on information of cumulative production which is a function of time and studywith statistical data, a new model for the prediction of the production rate, cumulative produced rate, recoverable reserves, max. production rate and the time when it occurs is established. It is demonstrated in this paper that the well known Gomperts prediction model canbe obtained by a simplification of this prediction model.

Key words: predictive production, cumulative production, recoverable reserves, model

摘要: 基于累积产量随时间增长的信息和大量统计研究的结果,推导建立了预测油气田产量的新模型。该模型可以用于预测油气田的产量、累积产量、可采储量和最高年产量及其发生的时间,并能简化为着名的Gompertz(龚帕兹)预测模型。

关键词: 预测产量, 累积产量, 可采储量, 模型