CHEN Tuanhai CHEN Guoming LIN Hong. Analyzing and updating on the global time-dependent reliability for ageing platforms in ice zones[J]. Editorial office of ACTA PETROLEI SINICA, 2011, 32(3): 518-523.
Liu Jian,Chen Guoming, Huang Dongsheng.Evaluation method for fatigue reliability of offshore platform in ice region[J].Acta Petrolei Sinica,2006,27(5):115-118,123.
Xu Liangbin,Chen Guoming.Fuzzy control model for dynamic fatigue reliability of offshore drilling platform[J].Acta Petrolei Sinica,2010,31(1):148-151,156.
[5]American Petroleum Institute.API RP 2A-WSD Recommended practice for planning,designing and constructing fixed offshore platforms-working stress design[S].Washington,D.C.:API Publishing Services,2000.
[6]刘健.冰区海洋平台疲劳分析及虚拟安全系统开发[D].东营:中国石油大学,2005.
Liu Jian.Life fatigue analysis of offshore platform in ice region and development of virtual safety system[D].Dongying:China University of Petroleum,2005.
Fang Huacan, Xu Fayan,Chen Guoming.A new method of fatigue analysis of platform structure in Bohai Bay[J].Acta Petrolei Sinica,1997,18(4):95-100.
[8]Feng Wei,Shi Zhongmin,Liu Liming.A new model for ice forces on a conical structure[J].China Ocean Engineering,2005,19(1):139-146.
[9]Yue Qianjin,Qu Yan,Bi Xiangjun,et al.Ice force spectrum on narrow conical structures[J].Cold Regions Science and Technology,2007,49(2):161-169.
[10]Mróz A,Holnicki-Szulc J,Kärnä T.Mitigation of ice loading on off-shore wind turbines:Feasibility study of a semi-active solution[J].Computers and Structures,2008,86(3):217-226.
[11]Li Gang,Liu Xiang,Liu Yuan,et al.Optimum design of ice-resistant offshore jacket platforms in the Bohai Gulf in consideration of fatigue life of tubular joints[J].Ocean Engineering,2008,35(5/6):484-493.
[13]Ji Chunyan,Li Shanshan,Chen Minglu.A global reliability assessment method oil aging offshore platforms with corrosion and cracks[J].Chinese Ocean Engineering,2009,23(2):199-210.
[14]Ciampoli M,Ellingwood B R.Probabilistic methods for assessing current and future performance of concrete structures in nuclear power plants[J].Materials and Structures,2002,35(1):3-14.
Fang Huacan.Dong Shouping.Calculation of corrosion fatigue life of semi-submersible platform column[J].Acta Petrolei Sinica,1984,5(4):89-100.
[16]Qin Shengping,Cui Weicheng.Effect of corrosion models on the time-dependent reliability of steel plated elements[J].Marine Structures,2003,16(1):15-34.
Xu Liangbin,Chen Guoming.Updating probability reliability model based on fuzzy Bayesian theory[J].Journal of the University of Petroleum,China:Edition of Natural Science,2003,27(6):53-56.
[18]Estes A C,Frangopol D M,Foltz S D.Updating reliability of steel miter gates on locks and dams using visual inspection results[J].Engineering Structures,2004,26(3):319-333.