[1] Dieumegard C,Fellows P.Installation of metallic tube umbilicals in 3 000 meters water[R].SPE 15368,2003.
[2] Simpson P J,Luffrum S.A novel method for coiled tubing installation[R].SPE 19498,2008.
[3] Uyeda S T,Radu E J,Talbot Jr.W J,et al.Self propelled dynamically positioned reel pipe laying ship:US,4269540[P].1981-5-26.
[4] Huang Shan,Vassalos D.A numerical method for predicting snap loading of marine cables[J].Applied Ocean Research,1993,15(4):235-242.
[5] Patel M H,Vaz M A.The transient behaviour of marine cables being laid:the two-dimensional problem[J].Applied Ocean Research,1995,17(4):245-258.
[6] Vaz M A,Patel M H.Three-dimensional behavior of elastic marine cables in sheared currents[J].Applied Ocean Research,2000,22(1):45-53.
[7] Guarize R,Matos N A F,Sagrilo L V S,et al.Neural networks in the dynamic response analysis of slender marine structures[J].Applied Ocean Research,2007,29(4):191-198.
[8] Szczotka M,Wojciech S,Maczyński A.Mathematical model of a pipelay spread[J].Archive of Mechanical Engineering,2007,LIV(1):27-46.
[9] Szczotka M.Pipe laying simulation with an active reel drive[J].Ocean Engineering,2010,37(7):539-548.
[10] Szczotka M.Dynamic analysis of an offshore pipe laying operation using the reel method[J].Acta Mechanica Sinca,2011,27(1):44-55.
[11] Mattiazzo G,Mauro S,Guinzio P S.A tensioner simulator for use in a pipelaying design tool[J].Mechatronics,2009,19(8):1280-1285.
[12] Zhang Junliang,Li Lin,Zhang Shimin.A tensioner system for a deepwater pipelaying vessel:ICMTMA 2009:proceedings of the 2009 International Conference on Measuring Technology and Mechatronics Automation,Zhangjiajie,Hunan,April 11-12,2009[C].Washington,D.C.:IEEE Computer Society,2009.
[13] Almondo A,Mattiazzo G,Mauro S,et al.Numerical model of a tensioner for undersea pipes laying:proceedings of 8th Biennial ASME Conference on Engineering Systems Design and Analysis,Torino,Italy,July 4-7,2006[C].New York:Asme Conference Proceedings,2006.
[14] Adamiec-Wójcik I.Interactions between vibrations of flexible links and base motion of manipulators[J].Journal of Theoretical and Applied Mechanic,2002,40(2):449-463.
[15] Plosa J,Wojciech S.Dynamics of systems with changing configuration and with flexible beam-like links[J].Mechanism and Machine Theory,2000,35(11):1515-1534.
[16] Augustynek K,Adamiec-Wójcik I.Analysis of mechanisms with flexible beam-like links rotary joints and assembly errors[J].Archive of Applied Mechanics,2012,82(2):283-295.
[17] Cha J H,Roh M,Lee K Y.Dynamic response simulation of a heavy cargo suspended by a floating crane based on multibody system dynamics[J].Ocean Engineering,2010,37(14/15):1273-1291.
[18] 肖能.水下生产系统脐带缆截面设计与分析[D].大连:大连理工大学,2011.
Xiao Neng.Cross-section design and analysis of umbilical cable in subsea production system[D].Dalian:Dalian University of Technology,2011.
[19] 卢青针,肖能,阎军.钢管脐带缆弯曲刚度有限元分析[J].计算机辅助工程,2011,20(2):16-19.
Lu Qingzhen,Xiao Neng,Yan Jun.Finite element analysis on bending stiffness of steel tube umbilical cable[J].Computer Aided Engineering,2011,20(2):16-19.
[20] 杨来伍,梅凤翔.变质量系统力学[M].北京:北京理工大学出版社,1989.
Yang Laiwu,Mei Fengxiang.Mechanics of variable mass system[M].Beijing:Beijing Institute of Technology Press,1989. |