[1] GROHMANN A J,KACULI J T. Beyond the watch circle wellhead system global weak point analysis[R].OTC 25758,2015.
[2] CHANG Yuanjiang,WU Xiangfei,ZHANG Changshuai,et al.Dynamic bayesian networks based approach for risk analysis of subsea wellhead fatigue failure during service life[J].Reliability Engineering & System Safety,2019,188:454-462.
[3] LYLUND A.Analysis of riser-induced loading on wellhead[D].Trondheim:Norwegian University of Science and Technology,2015.
[4] CHANG Yuanjiang,WU Xiangfei,CHEN Guoming,et al.Comprehensive risk assessment of deepwater drilling riser using fuzzy Petri net model[J].Process Safety and Environmental Protection,2018,117:483-497.
[5] RØRGÅRD O,SØNÅSEN K O,ELLEFSEN Ø,et al.Introducing reactive flex-Joint:10-15 times prolonged wellhead Life[R].OTC 27584,2017.
[6] MILBERGER L J,YU A,HOSIE S,et al.Structural requirements for the effective transfer of environmental loadings in a subsea wellhead system[R].OTC 6706,1991.
[7] SINGEETHAM S P.An optimised design of a typical subsea drilling system for fatigue applications[C]//The 8th International Conference on Ocean,Offshore and Arctic Engineering.Holland,OMAE,1989.
[8] PERALES S A,KACULI J T.Subsea wellhead system verification analysis methodology for HPHT applications per API TR 1PER15K-1 and API 17TR8[R].OTC 25835,2015.
[9] REINÅS L.Wellhead fatigue analysis-surface casing cement boundary condition for subsea wellhead fatigue analytical models[D].Stavanger:University of Stavanger,2012.
[10] REINÅS L,SæTHER M,ADNØY B S.The effect of a fatigue failure on the wellhead ultimate load capacity[C]//ASME 2012 31st International Conference on Ocean,Offshore and Arctic Engineering.Rio de Janeiro,Brazil:Ocean,Offshore and Arctic Engineering Division,2012.
[11] GRYTØYR G,HØRTE T,LEM A I.Wellhead fatigue analysis method[R].Report no/DNV Reg.No.:2011-0063/12q2071-26,2011.
[12] CHANG G A,LIU M L,SONG Hao.Design verification and load estimation of subsea wellhead in HPHT applications[R].OTC 27754,2017.
[13] HOWELLS H,BAKER R,RIMMER A.Measurement of wellhead fatigue[R].OTC 25684,2015.
[14] SUNDAY K,WARD P,GRIFFIN C,et al.Detailed approach for the assessment of accumulated wellhead fatigue[R].SPE 175441,2015.
[15] CHANG Yuanjiang,CHEN Guoming,WU Xiangfei,et al.Failure probability analysis for emergency disconnect of deepwater drilling riser using Bayesian network[J].Journal of Loss Prevention in the Process Industries,2018,51:42-53.
[16] 畅元江,王健,李家仪,等.考虑温度影响的水下井口疲劳损伤计算方法[J].石油学报,2019,40(4):482-492.
CHANG YuanJiang,WANG Jian,LI Jiayi,et al.Calculation method of subsea wellhead fatigue damage considering thermal effect[J].Acta Petrolei Sinica,2019,40(4):482-492.
[17] LIEN A K D.Analysis of methods for reducing subsea wellhead fatigue[D].Trondheim:Norwegian University of Science and Technology,2010.
[18] YAN Wei,CHEN Zijian,DENG Jingen,et al.Numerical method for subsea wellhead stability analysis in deepwater drilling[J].Ocean Engineering,2015,98:50-56.
[19] XU Yuqiang,GUAN Zhichuan,JIN Yan,et al.Risk assessment method of subsea wellhead instability in consideration of uncertain factors in deepwater drilling[J].Arabian Journal for Science and Engineering,2018,43(5):2659-2672.
[20] LIM T K,TELLIER E,HOWELLS H.Wellhead,conductor and casing fatigue-causes and mitigation[C]//Proceeding of the Deep Offshore Technology.Perth,Australia:DOT,2013.
[21] 姬景奇.深水水下井口疲劳损伤评估及其对策研究[D].青岛:中国石油大学(华东),2017.
JI Jingqi.Study on fatigue assessment and countermeasure of subsea wellhead in deepwater[D].Qingdao:China University of Petroleum,2017.
[22] Det Norske Verita.Wellhead fatigue analysis:DNV RP 0142[S].Norway:DNV,2015.
[23] 鞠少栋.深水钻井隔水管及井口作业分析与决策研究[D].青岛:中国石油大学(华东),2012.
JU Shaodong.Research on operation analysis and decision for deepwater drilling riser and subsea wellhead[D].Qingdao:China University of Petroleum,2012.
[24] International Organization for Standardization.Deepwater drilling riser methodologies,operations,and integrity technical report:ISO/TR 13624-2[S].Geneva:ISO,2009.
[25] 畅元江,陈国明,许亮斌.导向架隔水管在波流联合作用下的非线性动力响应[J].中国石油 大学学报:自然科学版,2006,30(5):74-77.
CHANG Yuanjiang,CHEN Guoming,XU Liangbin.Non-linear dynamic response induced by wave-current for marine risers with guide-frames[J].Journal of China University of Petroleum:Edition of Natural Science,2006,30(5):74-77.
[26] 畅元江,王健,姬景奇,等.基于局部等效方法的深水水下井口半解耦分析模型[J].中国石 油大学学报:自然科学版,2019,43(3):129-137.
CHANG Yuanjiang,WANG Jian,JI Jingqi,et al.A semi decoupled analysis model of subsea wellhead based on local equivalent method[J].Journal of China University of Petroleum:Edition of Natural Science,2019,43(3):129-137.
[27] CHANG Yuanjiang,LI Jiayi,WANG Jian,et al.Comparative investigation of dynamic analysis models for subsea wellhead in deepwater[C]//The 29th International Ocean and Polar Engineering Conference.Honolulu,Hawaii,USA:International Society of Offshore and Polar Engineers,2019.
[28] 畅元江.深水钻井隔水管设计方法及其应用研究[D].青岛:中国石油大学(华东),2008.
CHANG Yuanjiang.Design approach and its application for deepwater drilling risers[D].Qingdao:China University of Petroleum,2008.
[29] BUCHMILLER D,HORTE T,GRYTOYR G,et al.Establishing an industry best practice on subsea wellhead fatigue assessment[R].SPE 151198,2012.
[30] 畅元江,陈国明,刘健.深水钻井隔水管的波致长期疲劳[J].机械强度,2009,31(5):797-802.
CHANG Yuanjiang,CHEN Guoming,LIU Jian.Long-term wave fatigue analysis of deepwater drilling riser[J].Journal of Mechanical Strength,2009,31(5):797-802.
[31] 刘秀全,陈国明,畅元江,等.深水钻井隔水管时域随机波激疲劳分析[J].中国石油大学学报:自然科学版,2012,36(2):146-151.
LIU Xiuquan,CHEN Guoming,CHANG Yuanjiang,et al.Time domain random wave-loading fatigue analysis on deepwater drilling risers[J].Journal of China University of Petroleum:Edition of Natural Science,2012,36(2):146-151.
[32] 张慎颜,刘秀全,畅元江,等.深水钻井平台-隔水管系统波激疲劳分析[J].船舶力学,2019,23(7):843-850.
ZHANG Shenyan,LIU Xiuquan,CHANG Yuanjiang,et al.Wave-loading fatigue analysis on deep-water drilling platform/riser system[J].Journal of Ship Mechanics,2019,23(7):843-850.
[33] 畅元江,杨焕丽,刘秀全,等.深水钻井隔水管-井口系统涡激疲劳详细分析[J].石油学报,2014,35(1):146-151.
CHANG Yuanjiang,YANG Huanli,LIU Xiuquan,et al.Detailed analysis of vortex induced fatigue for deep-water drilling riser-wellhead system[J].Acta Petrolei Sinica,2014,35(1):146-151.
[34] 孙友义,鞠少栋,蒋世全,等.超深水钻井隔水管-井口系统涡激振动疲劳分析[J].石油学报,2011,32(6):1050-1054.
SUN Youyi,JU Shaodong,JIANG Shiquan,et al.Fatigue analysis of the vortex-induced vibration in a drilling riser-wellhead system in ultra deepwater[J].Acta Petrolei Sinica,2011,32(6):1050-1054.
[35] 柳军,郭晓强,刘清友,等.考虑顺流向和横流向耦合作用的海洋立管涡激振动响应特性[J].石油学报,2019,40(10):1270-1280.
LIU Jun,GUO Xiaoqiang,LIU Qingyou,et al.Vortex induced vibration response characteristics of marine riser considering the in-line and cross-flow coupling effect[J].Acta Petrolei Sinica,2019,40(10):1270-1280.
[36] 刘秀全,陈国明,畅元江,等.深水钻井平台-隔水管耦合系统漂移预警界限[J].石油勘探与开发,2016,43(4):641-646.
LIU Xiuquan,CHEN Guoming,CHANG Yuanjiang,et al.Drift-off warning limits for deepwater drilling platform/riser coupling system[J].Petroleum Exploration and Development,2016,43(4):641-646.
[37] 张慎颜,刘秀全,畅元江,等.深水钻井平台-张紧器-隔水管耦合系统动力学特性分析[J].中国石油大学学报:自然科学版,2019,43(2):123-130.
ZHANG Shenyan,LIU Xiuquan,CHANG Yuanjiang,et al.Dynamic characteristic analysis on deepwater drilling platform/tensioner/riser coupling system[J].Journal of China University of Petroleum:Edition of Natural Science,2019,43(2):123-130.
[38] WANG Yanbin,GAO Deli,FANG Jun.Coupled dynamic analysis of deepwater drilling riser under combined forcing and parametric excitation[J].Journal of Natural Gas Science and Engineering,2015,27:1739-1947.
[39] 吕涛,徐长航,陈国明,等.自升式海洋平台升降作业刚柔耦合动力学特性[J].石油学报,2018,39(7):829-836.
LV Tao,XU Changhang,CHEN Guoming,et al.Rigid-flexible coupling dynamic characteristics for elevating operation of jack-up offshore platform[J].Acta Petrolei Sinica,2018,39(7):829-836.
[40] 黄鲁蒙,张彦廷,孙选建,等.海洋浮式钻井液压绞车升沉补偿系统设计[J].石油学报,2017,38(9):1091-1098.
HUANG Lumeng,ZHANG Yanting,SUN Xuanjian,et al.Design of hydraulic winch heave compensation system for offshore floating drilling[J].Acta Petrolei Sinica,2017,38(9):1091-1098.
[41] SAN PEDRO R I,HAMILTON M E,BHALLA K.Assessing uncertainties in wellhead system fatigue life prediction[R].OTC 25697,2015.
[42] GRUTØYR G,REINÅS L,EILERTSEN L E,et al.Full scale measurements of cyclic bending moments on subsea wellheads on the Norwegian continental shelf[R].SPE 179444,2016.
[43] RIMMER A,HOWELLS H,WARD P.Evaluation of wellhead fatigue using in-service structural monitoring data[R].OTC 23981,2013.
[44] MCNEILL S,AGARWAL P,BHALLA K,et al.Wellhead fatigue monitoring during subsea well plug and abandonment activities[R].OTC 27562,2017.
[45] HEGSETH M J.Assessment of uncertainties in estimated wellhead fatigue[D].Trondheim:Norwegian University of Science and Technology,2014.
[46] 刘秀全,陈国明,畅元江,等.内孤立波作用下深水锚泊平台隔水管耦合系统动力学特性[J].石油学报,2017,38(12):1448-1456.
LIU Xiuquan,CHEN Guoming,CHANG Yuanjiang,et al.Dynamic characteristics of deepwater mooring platform-riser coupling system under internal solitary wave[J].Acta Petrolei Sinica,2017,38(12):1448-1456.
[47] GUO Haiyan,ZHANG Li,LI Xiaomin,et al.Dynamic responses of top tensioned riser under combined excitation of internal solitary wave,surface wave and vessel motion[J].Journal of Ocean University of China,2013,12(1):6-12.
[48] LIM T K,KOSKA R,TELLIER E.Overcoming installation challenges to wellhead and conductor fatigue[C]//The 32th International Conference on Ocean,Offshore and Arctic Engineering.Nantes,France:Ocean,Offshore and Arctic Engineering Division,2013.
[49] ZAKERI A,CLUKEY E,KEBADZE B,et al.Recent advances in soil response modeling for well conductor fatigue analysis and development of new approaches[R].OTC 25795,2015.
[50] MERCAN B,CHANDRA Y,CAMPBELL M,et al.Soil model assessment for subsea wellhead fatigue using monitoring data[R].OTC 27662,2017.
[51] ZAKERI A,CLUKEY E C,KEBADZE E B,et al.Fatigue analysis of offshore well conductors:Part I-Study overview and evaluation of Series 1 centrifuge tests in normally consolidated to lightly over-consolidated kaolin clay[J].Applied Ocean Research,2016,57:78-95.
[52] ZAKERI A,CLUKEY E C,KEBADZE E B,et al.Fatigue analysis of offshore well conductors:Part II-Development of new approaches for conductor fatigue analysis in clays and sands[J].Applied Ocean Research,2016,57:96-113.
[53] GE L M,KEBADZE B,HENDERSON J,et al.Recent improvements in subsea wellhead fatigue monitoring algorithm and accuracy using verification and calibration techniques[R].OTC 27613,2017.
[54] HØRTE T,RUSSO M,MACKE M,et al.Benefit of measurements and structural reliability analysis for wellhead fatigue[C]//The 32th International Conference on Ocean,Offshore and Arctic Engineering.Nantes,France:Ocean,Offshore and Arctic Engineering Division,2013.
[55] EVANS J T,MCGRAIL J.An evaluation of the fatigue performance of subsea wellhead systems and recommendations for fatigue enhancements[R].OTC 21400,2011.
[56] GREENE J F,WILLIAMS D.The influence of drilling rig and riser system selection on wellhead fatigue loading[C]//The 31th International Conference on Ocean,Offshore and Arctic Engineering.Rio de Janeiro,Brazil:Ocean,Offshore and Arctic Engineering Division,2012.
[57] MCNEILL S,AGARWAL P,KLUK D,et al.Subsea wellhead and riser fatigue monitoring in a strong surface and submerged current environment[R].OTC 25403,2014.
[58] GREGERSEN K.Evaluation of wellhead fatigue for drilling risers[D].Trondheim:Norwegian University of Science and Technology,2015.
[59] American Petroleum Institute.Recommended practice for design,selection,operation and maintenance of marine drilling riser systems:API RP 16Q[S].US:API,1993.
[60] Det Norske Verit.Fatigue design of offshore steel structures:DNV RP C203[S].Norway:DNV,2010.
[61] 刘秀全,陈国明,畅元江,等.深水钻井隔水管-导管系统波激疲劳分析[J].石油学报,2013,34(5):977-982.
LIU Xiuquan,CHEN Guoming,CHANG Yuanjiang,et al.Wave induced fatigue analysis on deepwater drilling riser-conductor system[J].Acta Petrolei Sinica,2013,34(5):977-982.
[62] MAO Liangjie,LIU Qingyou,ZHOU Shouwei,et al.Deep water drilling riser mechanical behavior analysis considering actual riser string configuration[J].Journal of Natural Gas Science and Engineering,2016,33:240-254.
[63] 宋洵成,管志川.深水钻井井筒全瞬态传热特征[J].石油学报,2011,32(4):704-708.
SONG Xuncheng,GUAN Zhichuan.Full transient analysis of heat transfer during drilling fluid circulation in deep-water wells[J].Acta Petrolei Sinica,2011,32(4):704-708.
[64] 魏纳,孙万通,孟英峰,等.海洋天然气水合物藏钻探环空相态特性[J].石油学报,2017,38(6):710-720.
WEI Na,SUN Wantong,MENG Yingfeng,et al.Annular phase behavior analysis during marine natural gas hydrate reservoir drilling[J].Acta Petrolei Sinica,2017,38(6):710-720.
[65] SEVILLANO L C,DE ANDRAD J,SANGESLAND S,et al.Thermal effects on subsea wellheafatigue during workover operations[R].SPE 180065,2016.
[66] MCCOY B J,SINGEETHAM S.Development of the 18-3/4"-20,000 psi subsea wellhead system for high pressure and high temperature applications[R].SPE 119427,2009.
[67] SINGEETHAM S,MCCOY B J.Development of the 18-3/4"-20,000 psi subsea wellhead system for high pressure and high temperature applications[R].OTC 19694,2008.
[68] JAISWAL V,FENG Lifeng,SARASWAT R,et al.Fatigue analysis of non-rigid locked wellhead[C]//The 26th International Ocean and Polar Engineering Conference.Rhodes,Greece:International Society of Offshore and Polar Engineers,2016.
[69] MATTRY A J,IONESCU M,OSEN P,et al.Wellhead design for fatigue optimization[R].OTC 27602,2017.
[70] SKOGSBERG L,MALIGAS M N.Material selection for deep water wellhead applications[C]//CORROSION 2001.Houston,Texas:NACE International,2001:22-30.
[71] Det Norske Veritas.Wellhead fatigue analysis:DNVGL RP E104[S].Norway:DNV,2018.
[72] Det Norske Veritas.Fatigue strength analysis of offshore steel structures:DNV RP C203[S].Norway:DNV,2001.
[73] British Standards Institute.Code of practice for fatigue design and assessment of steel structures:BS 7608:1993[S].UK:BSI,1993.
[74] 杨进.深水油气井表层导管下入深度计算方法[J].石油学报,2019,40(11):1396-1406.
YANG Jin.Calculation method of surface conductor setting depth in deepwater oil and gas wells[J].Acta Petrolei Sinica,2019,40(11):1396-1406.
[75] REINAAS L.Wellhead fatigue analysis surface casing cement boundary condition for subsea wellhead fatigue analytical models[D].Stavanger:University of Stavanger,2012. |