[1] 金衍,陈勉,柳贡慧,等.大位移井的井壁稳定力学分析[J].地质力学学报,1999,5(1):4-11.
Jin Yan,Chen Mian,Liu Gonghui,et al.Wellbore stability analysis of extended reach wells[J].Journal of Geomechanics,1999, 5(1):4-11.
[2] 金娟,刘建东,沈露禾,等.斜井水平井优势钻井方位确定方法研究[J].石油钻采工艺,2009,31(3):26-29.
Jin Juan,Liu Jiandong,Shen Luhe,et al.Research on optimal azimuth determination of inclined hole and horizontal hole[J].Oil Drilling & Production Technology,2009,31(3):26-29.
[3] 刘向君,罗平亚,孟英峰.地应力场对井眼轨迹设计及稳定性的影响研究[J].天然气工业,2004,24(9):57-59.
Liu Xiangjun,Luo Pingya,Meng Yingfeng.Influence of ground stress field on borehole trajectory design and wellface stability[J].Natural Gas Industry,2004,24(9):57-59.
[4] Al-Ajmi A M,Zimmerman R W.A new well path optimization model for increased mechanical borehole stability[J].Journal of Petroleum Science and Engineering,2009,69(1/2):53-62.
[5] 李玉飞,付永强,唐庚,等.地应力类型影响定向井井壁稳定的规律[J].天然气工业,2012,32(3):78-80.
Li Yufei,Fu Yongqiang,Tang Geng,et al.Laws of the effects of earth stress patterns on wellbore stability in a directional well[J].Natural Gas Industry,2012,32(3):78-80.
[6] 陈朝伟,张辉,申彪,等.水平井安全和危险钻井方位[J].石油学报,2013,34(1):164-168.
Chen Chaowei,Zhang Hui,Shen Biao,et al.A study on safe and dangerous drilling azimuths of horizontal well[J].Acta Petrolei Sinica,2013,34(1):164-168.
[7] 周长江,刘向君,张卓,等.水平气井井壁稳定性研究[J].天然气工业,2006,28(6):81-82.
Zhou Changjiang,Liu Xiangjun,Zhang Zhuo,et al.Study on wellbore stability of horizontal gas wells[J].Natural Gas Industry,2006,28(6):81-82.
[8] Aadnøy B S,Chenevert M E.Stability of highly inclined boreholes[J].SPE Drilling Engineering,1987,2(4):364-374.
[9] Thorsen K.Analytical failure prediction of inclined boreholes[J].International Journal of Geomechanics, 2013,13(3):318-325.
[10] Bradley W B.Failure of inclined borehole[J].Journal of Energy Resources Technology,1979,101(4):232-239.
[11] Islam M A.Modeling and prediction of borehole collapse pressure during underbalanced drilling in shale[D].Trondheim:Norwegian University of Science and Technology,2011.
[12] Zhang Weidong,Gao Jiajia,Lan Kai,et al.Analysis of borehole collapse and fracture initiation positions and drilling trajectory optimization[J].Journal of Petroleum Science and Engineering,2015,129(5):29-39.
[13] Tan C P,Willoughby D R,Zhou S H,et al.An analytical method for determining horizontal stress bounds from wellbore data[J].International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts,1993,30(7):1103-1109.
[14] Chen X,Tan C P,Haberfield C M.A comprehensive,practical approach for wellbore instability management[J].SPE Drilling & Completion,2002,17(4):224-236.
[15] McLean M,Addis M.Wellbore stability:the effect of strength criteria on mud weight recommendations[R].SPE 20405,1990.
[16] Ewy R T.Wellbore-stability predictions by use of a modified Lade criterion[J].SPE Drilling & Completion, 1999,14(2):85-91.
[17] Al-Ajmi A M,Zimmerman R W.Stability analysis of vertical boreholes using the Mogi-Coulomb failure criterion[J].International Journal of Rock Mechanics and Mining Sciences,2006,43(8):1200-1211.
[18] Zhang Lianyang,Cao Ping,Radha K C.Evaluation of rock strength criteria for wellbore stability analysis [J].International Journal of Rock Mechanics and Mining Sciences,2010,47(8):1304-1316.
[19] Zare-Reisabadi M R,Kaffash A,Shadizadeh S R.Determination of optimal well trajectory during drilling and production based on borehole stability[J].International Journal of Rock Mechanics and Mining Sciences,2012,56:77-87.
[20] Moos D,Peška P,Zoback M D,et al.Predicting the stability of horizontal wells and multi-laterals-the role of in situ stress and rock properties[C]//SPE International Conference on Horizontal Well Technology.Calgary,Alberta,Canada:SPE,1998:119-130.
[21] Karstad E,Aadnøy B S.Optimization of borehole stability using 3-D stress optimization[R].SPE 97149,2005.
[22] Al-Ajmi A M,Zimmerman R W.Relation between the Mogi and the Coulomb failure criteria[J].International Journal of Rock Mechanics and Mining Sciences,2005,42(3):431-439.
[23] Paši? B,Gaurina-Meðimurec N,Matanovic D.Wellbore instability:causes and consequences/Nestabilnost kanala bušotine: uzroci I posljedice[J].Rudarsko-Geolosko-Naftni Zbornik,2007,19(1):87.
[24] Anderson E M.The dynamics of faulting and dyke Formation with applications to Britain[M].Edinburgh:Oliver and Boyd,1951.
[25] 阳友奎,肖长富,吴刚,等.不同地应力状态下水力压裂的破裂模式[J].重庆大学学报,1993,16(3):30-35.
Yang Youkui,Xiao Changfu,Wu Gang,et al.Hydrofracturing breakdown modes under different in-situ stress states[J].Journal of Chongqing University,1993,16(3):30-35.
[26] 刘建军,冯夏庭,裴桂红.水力压裂三维数学模型研究[J].岩石力学与工程学报,2003,22(12):2042-2046.
Liu Jianjun,Feng Xiating,Pei Guihong.Study on mathematical model of three dimensional hydraulic fracturing[J].Chinese Journal of Rock Mechanics and Engineering, 2003,22(12):2042-2046.
[27] 吴超,臧艳彬,张东清,等.定向井随钻井壁稳定预测方法及其应用[J].石油学报,2015,36(10):1290-1298.
Wu Chao,Zang Yanbin,Zhang Dongqing,et al.A method of borehole stability prediction while drilling directional wells and its application[J].Acta Petrolei Sinica,2015,36(10):1290-1298.
[28] 吴超,陈小锋,王磊.钻井液密度窗口随钻预测理论及其工程应用[J].石油学报,2016,37(3):399-405.
Wu Chao,Chen Xiaofeng,Wang Lei.A theory on predicting drilling fluid density windows while drilling and its engineering application [J].Acta Petrolei Sinica,2016,37(3):399-405. |