[1] 樊建明,王冲,屈雪峰,等. 鄂尔多斯盆地致密油水平井注水吞吐开发实践——以延长组长7油层组为例[J].石油学报,2019,40(6):706-715. FAN Jianming,WANG Chong,QU Xuefeng,et al.Development and practice of water flooding huff-puff in tight oil horizontal well,Ordos Basin:a case study of Yanchang Formation Chang 7 oil layer[J].Acta Petrolei Sinica,2019,40(6):706-715. [2] 迟焕鹏,单衍胜,李奎,等.水力喷射微小井眼水平井流动耦合模型及影响规律[J].石油学报,2018,39(8):947-954. CHI Huanpeng,SHAN Yansheng,LI Kui,et al.Coupled flow model and influence rule of hydra-jet micro-hole horizontal well[J].Acta Petrolei Sinica,2018,39(8):947-954. [3] 蒲春生,郑恒,杨兆平,等.水平井分段体积压裂复杂裂缝形成机制研究现状与发展趋势[J].石油学报,2020,41(12):1734-1743. PU Chunsheng,ZHENG Heng,YANG Zhaoping,et al.Research status and development trend of the formation mechanism of complex fractures by staged volume fracturing in horizontal wells[J].Acta Petrolei Sinica,2020,41(12):1734-1743. [4] 李丽,汪雄雄,刘双全,等.水平井筒气水流动规律及影响因素[J].石油学报,2019,40(10):1244-1254. LI Li,WANG Xiongxiong,LIU Shuangquan,et al.Gas-water flow law in horizontal wellbore and its influencing factors[J].Acta Petrolei Sinica,2019,40(10):1244-1254. [5] LEAST B,BONNER A J,REGULACION R E,et al.Autonomous ICD installation success in ecuador heavy oil:a case study[R].SPE 166495,2013. [6] VELA I,VILORIA-GOMEZ L A,CAICEDO R,et al.Well production enhancement results with inflow control device (ICD)completions in horizontal wells in Ecuador[R].SPE 143431,2011. [7] HENRIKSEN K H,GULE E I,AUGUSTINE J R.Case study:the application of inflow control devices in the troll field[R].SPE 100308,2006. [8] 方全堂,张锋利,段永刚,等.水平井流入控制阀控底水原理及影响因素分析[J].西南石油大学学报:自然科学版,2012,34(6):107-112. FANG Quantang,ZHANG Fengli,DUAN Yonggang,et al.Analyses of influencing factors and mechanism of controlling bottom water in horizontal well with inflow control device[J].Journal of Southwest Petroleum University:Science & Technology Edition,2012,34(6):107-112. [9] 付宣,李根生,崔明月,等.非均质底水油藏水平井ICD完井耦合模型与目标剖面计算方法[J].石油钻采工艺,2015,37(4):27-32. FU Xuan,LI Gensheng,CUI Mingyue,et al.Calculation method for ICD completion coupling model and target profile of horizontal wells in heterogeneous bottom water reservoir[J].Oil Drilling & Production Technology,2015,37(4):27-32. [10] 帅春岗,段永刚,冉林,等.水平井ICD控水方法研究[J].石油钻采工艺,2012,34(1):85-88. SHUAI Chungang,DUAN Yonggang,RAN Lin,et al.Research on the method of controlling bottom water with Inflow Control Devices (ICD)in horizontal well[J].Oil Drilling & Production Technology,2012,34(1):85-88. [11] VACHON G P,KLACZEK W,ERICKSON P J,et al.Use of flow control devices (FCDs)to enforce conformance in steam assisted gravity drainage (SAGD)completions[R].SPE 174416,2015. [12] YUAN Jianyang,NUGENT D.Subcool,fluid productivity,and liquid level above a SAGD producer[J].Journal of Canadian Petroleum Technology,2013,52(5):360-367. [13] BUTLER R.The steam and gas push (SAGP)[J].Journal of Canadian Petroleum Technology,1999,38(3):54-61. [14] LASTIWKA M,BAILEY C,JAMES B,et al.A practical approach to the use and design of flow control devices in SAGD[R].SPE 185005,2017. [15] GOHARI K,MORENO O B,ROMANOVA U,et al.Technical review of tubing deployed flow control devices at mackay river[R].SPE 196212,2019. [16] GORHAM T,SIMS J,BUELL R S,et al.Horizontal steam injection liner deployed flow control device design development and testing[R].SPE 198698,2019. [17] CLARK H P,ASCANIO F A,VAN KRUIJSDIJK C,et al.Method to improve thermal EOR performance using intelligent well technology:orion SAGD field trial[R].SPE 137133,2010. [18] Schlumberger Limited.Inflow and injection control devices (ICDs)[EB/OL].(2017-08-04)[2020-07-01].https://www.slb.com/services/completions/sand_control/sandscreens/inflow_control_devices.aspx. [19] Halliburton.Subsurface flow controls[EB/OL].(2017-01-24)[2020-07-01].http://www.halliburton.com/en-US/ps/completions/well-completions/subsurface-flow-controls/default.page?node-id=hfqel9w4. [20] Baker Hughes.EQUALIZER inflow and injection control devices[EB/OL].(2016-12-04)[2020-07-01].https://www.bhge.com/upstream/completions/inflow-and-injection-control-devices/equalizer-inflow-and-injection-control-devices. [21] RGL Reservoir Management Inc.Unlock the potential of your reservoir with flow control[EB/OL].(2018-04-12)[2020-07-01].http://www.rglrm.com/FlowControl. [22] Exceed (Canada)Oilfield Equipment Inc.Inflow control devices[EB/OL].(2018-01-01)[2020-07-01].http://www.exceedoilfield.ca/product/inflow-control-devices-icd/. [23] Tendeka.Inflow control[EB/OL].(2017-12-24)[2020-07-01].http://www.tendeka.com/technologies/inflow-control/. [24] Weatherford.Inflow control devices[EB/OL].(2017-04-14)[2020-07-01].https://weatherford.com/en/products-and-services/completions/sand-control/inflow-control-devices. [25] Alberta Flux Solutions Ltd.Flow control for Canadian Oilsands[EB/OL].(2018-09-24)[2020-07-01].https://albertafluxsolutions.ca/products/fluxtool/. [26] Conocophillips.Annual Surmont SAGD performance review[R].Calgary:AER,2019. [27] STALDER J L.Test of SAGD flow-distribution-control liner system in the Surmont Field,Alberta,Canada[J].Journal of Canadian Petroleum Technology,2013,52(2):95-100. [28] Athabasca Oil.Aer hangingstone project update[R].Calgary:AER,2019. [29] Cenovus Energy Inc.Christina lake in-situ progress report[R].Calgary:AER,2019. [30] MEG Energy.Christina lake regional project 2018/2019 performance presentation[R].Calgary:AER,2019. [31] Devon Canada Corporation.2018 performance presentation[R].Calgary:AER,2018. [32] Nexen Energy ULC.Long Lake Kinosis oil sands project annual performance presentation[R].Calgary:AER,2018. [33] Suncor.Suncor MacKay river project 2019 AER performance presentation[R].Calgary:AER,2018. [34] CNRL.Primrose,Wolf Lake,and Burnt Lake 2017 Annual Presentation to the AER[R].Calgary:AER,2018. [35] IRANI M.On subcool control in SAGD producers-Part II:localized-hot-spots effects and optimization of flow-control devices[J].SPE Journal,2019,24(4):1613-1629. [36] LASTIWKA M,BURKE L H,BOOY D,et al.Laboratory and Field Testing of a Steam-Limiting Flow Control Device Developed for Thermal Applications[R].SPE 196072,2019. [37] GURSES S,CHOCHUA G,RUDIC A,et al.Dynamic modeling and design optimization of cyclonic autonomous inflow control devices[R].SPE 193824,2019. [38] NOROOZI M,MELO M,MONTOYA J,et al.Optimizing flow control devices in SAGD operations:how different methodologies are functional[R].SPE 178468,2015. [39] BANERJEE S,HASCAKIR B.Flow control devices in SAGD completion design:enhanced heavy oil/bitumen recovery through improved thermal efficiencies[R].SPE 185703,2017. [40] KYANPOUR M,CHEN Zhangxin.Design and optimization of orifice based flow control devices in steam assisted gravity drainage:a case study[R].SPE 171109,2014. [41] SHAD S,YAZDI M M.Wellbore modeling and design of nozzle-based inflow control device (ICD)for SAGD wells[R].SPE 170145,2014. [42] BANACK B,BURKE L H,BOOY D,et al.Characterization of flow control device performance with distributed fiber-optic sensors[R].SPE 195869,2019. |