[1] JACULLI M Q,MENDES J R,COLOMBO D. Evaluation of excessive wellhead motions:framework of analysis and case studies (Part I)[J].Journal of Petroleum Science and Engineering,2022,208:109571. [2] LIU Zengkai,MA Qiang,CAI Baoping,et al.Risk assessment on deepwater drilling well control based on dynamic Bayesian network[J].Process Safety and Environmental Protection,2021,149:643-654. [3] ZHANG Minghe,YANG Jin,WANG Yuanming,et al.Study on the static mechanics and control method of the tubular system during subsea wellhead construction in deep water[J].Ocean Engineering,2022,266:113108. [4] 杨进,李文龙,胡志强,等.深水钻井水下井口稳定性研究进展[J].中国海上油气,2020,32(4):124-130. YANG Jin,LI Wenlong,HU Zhiqiang,et al.Research progresses on subsea wellhead stability of deep water drilling[J].China Offshore Oil and Gas,2020,32(4):124-130. [5] WU Shengnan,ZHANG Qiao,LI Bin,et al.Reliability analysis of subsea wellhead system subject to fatigue and degradation during service life[J].Reliability Engineering & System Safety,2023,239:109494. [6] JACULLI M A,MENDES J R P,COLOMBO D.Evaluation of excessive wellhead motions:reliability assessment and wellhead integrity index (Part II)[J].Journal of Petroleum Science and Engineering,2022,208:109570. [7] 张智,赵苑瑾,张喆,等.深水井开采制度对天然气水合物分解的影响[J].石油学报,2022,43(2):281-292. ZHANG Zhi,ZHAO Yuanjin,ZHANG Zhe,et al.Influence of deep-water well production system on natural gas hydrate decomposition[J].Acta Petrolei Sinica,2022,43(2):281-292. [8] 畅元江,王健,李家仪,等.考虑温度影响的水下井口疲劳损伤计算方法[J].石油学报,2019,40(4):482-492. CHANG Yuanjiang,WANG Jian,LI Jiayi,et al.Calculation method of subsea wellhead fatigue damage considering thermal effect[J].Acta Petrolei Sinica,2019,40(4):482-492. [9] 王莹莹,王名春,杨钟山,等.水下采油树与永久导向基座对接过程的动力特性[J].石油学报,2022,43(3):420-431. WANG Yingying,WANG Mingchun,YANG Zhongshan,et al.Dynamic characteristics of subsea Christmas tree in the process of docking with permanent guide base[J].Acta Petrolei Sinica,2022,43(3):420-431. [10] 周波,杨进,刘正礼,等.深水钻井表层导管静置时间窗口设计[J].石油勘探与开发,2014,41(2):234-238. ZHOU Bo,YANG Jin,LIU Zhengli,et al.Design of structure casing soaking time in deepwater drilling[J].Petroleum Exploration and Development,2014,41(2):234-238. [11] ZHOU Bo,YANG Jin,LIU Zhengli,et al.Model and experimental study on jetting flow rate for installing surface conductor in deep-water[J].Applied Ocean Research,2016,60:155-163. [12] 杨进.深水油气井表层导管下入深度计算方法[J].石油学报,2019,40(11):1396-1406. YANG Jin.Calculation method of surface conductor setting depth in deepwater oil and gas wells[J].Acta Petrolei Sinica,2019,40(11):1396-1406. [13] AKERS T J.Jetting of structural casing in deepwater environments:job design and operational practices[J].SPE Drilling & Completion,2008,23(1):29-40. [14] 张明贺,杨进,刘和兴,等.膨胀式导管提高深水钻井水下井口承载力的机理[J].石油学报,2021,42(6):791-800. ZHANG Minghe,YANG Jin,LIU Hexing,et al.A mechanism of expandable conductor used to improve the bearing capacity of subsea wellhead in deep-water drilling[J].Acta Petrolei Sinica,2021,42(6):791-800. [15] BECK R D,JACKSON C W,HAMILTON T K.Reliable deepwater structural casing installation using controlled jetting[R].SPE 22542,1991. [16] JEANJEAN P.Innovative design method for deepwater surface casings[R].SPE 77357,2002. [17] ROCHA L A S,JUNQUEIRA P,ROQUE J L.Overcoming deep and ultra deepwater drilling challenges[R].OTC 15233,2003. [18] ZHAO Xin,YIN Qishuai,YANG Jin,et al.Risk assessment of surface conductor jetting installation during deep-water drilling in sloping seabed[J].Ocean Engineering,2022,266:113057. [19] WANG Yanbin,GAO Deli,FANG Jun.Finite element analysis of deepwater conductor bearing capacity to analyze the subsea wellhead stability with consideration of contact interface models between pile and soil[J].Journal of Petroleum Science and Engineering,2015,126:48-54. [20] XU Yunjin, YANG Jin,MENG Wei,et al.Method of predicting soil mechanical parameters in shallow formation while jetting process in deep-water drilling [J].Marine Georesources & Geotechnology,2017,35(3):406-413. [21] 杨进,严德,田瑞瑞,等.深水喷射下表层导管合理钻头伸出量计算[J].石油勘探与开发,2013,40(3):367-370. YANG Jin,YAN De,TIAN Ruirui,et al.Bit stick-out calculation for the deepwater conductor jetting technique[J].Petroleum Exploration and Development,2013,40(3):367-370. [22] YAN Wei,CHEN Zijian,DENG Jingen,et al.Numerical method for subsea wellhead stability analysis in deepwater drilling[J].Ocean Engineering,2015,98:50-56. [23] 杨进,李磊,宋宇,等.中国海洋油气钻井技术发展现状及展望[J].石油学报,2023,44(12):2308-2318. YANG Jin,LI Lei,SONG Yu,et al.Current status and prospects of offshore oil and gas drilling technology development in China[J].Acta Petrolei Sinica,2023,44(12):2308-2318. [24] 杨进,傅超,刘书杰,等.超深水浅层建井关键技术创新与实践[J].石油学报,2022,43(10):1500-1508. YANG Jin,FU Chao,LIU Shujie,et al.Key technological innovation and practice of well construction in ultra-deepwater shallow formations [J].Acta Petrolei Sinica,2022,43(10):1500-1508. [25] Ahmed Yehia ABDELAZIZ A Y,EL NAGGAR M H,OUDA M.Determination of depth-of-fixity point for laterally loaded vertical offshore piles:a new approach[J].Ocean Engineering,2021,232:109113. [26] KAN Changbin,YANG Jin,YU Xiaocong,et al.Load bearing characteristics study on novel deepwater composite drilling conductor by simulation and experimental methods[J].Journal of Petroleum Science and Engineering,2018,171:289-301. [27] KAN Changbin,YANG Jin,YU Xiaocong,et al.Field experimental investigation of bit stick-out for different soil strengths during deepwater conductor injection[J].Journal of Petroleum Science and Engineering,2018,169:825-836. [28] KAN Changbin,GAO Deli,YANG Jin.Experimental study on critical displacement for drill-conductor injection during deepwater drilling[J].SPE Journal,2020,25(5):2206-2219. [29] TIAN Deqiang,FAN Honghai,LEIRA B J,et al.Study on the static behavior of installing a deep-water drilling riser on a production platform[J].Journal of Petroleum Science and Engineering,2020,185:106652. [30] NGUYEN T C,AL-SAFRAN E.Marine riser failure analysis for offshore conventional drilling and managed pressure drilling operations[J].Journal of Petroleum Science and Engineering,2021,199:108307. [31] PRASERTAMPORN P.Enhanced deepwater conductor jetting design for east Malaysia[R].IPTC 18738,2016. [32] MAO Liangjie,ZENG Song,LIU Qingyou.Dynamic mechanical behavior analysis of deep water drilling riser under hard hang-off evacuation conditions[J].Ocean Engineering,2019,183:318-331. [33] 苗典远.深水表层套管内管法固井技术与应用[J].石油地质与工程,2013,27(3):104-106. MIAO Dianyuan.Research and application of tube method of cementing in deep water surface casing[J].Petroleum Geology and Engineering,2013,27(3):104-106. [34] 刘秀全,陈国明,畅元江,等.深水钻井平台-隔水管耦合系统漂移预警界限[J].石油勘探与开发,2016,43(4):641-646. LIU Xiuquan,CHEN Guoming,CHANG Yuanjiang,et al.Drift-off warning limits for deepwater drilling platform/riser coupling system[J].Petroleum Exploration and Development,2016,43(4):641-646. [35] LIU Xiuquan,SUN Hexiang,LI Yanwei,et al.Theoretical modeling and analysis for mechanical properties of deepwater workover riser system[J].Ocean Engineering,2022,257:111701. [36] LI Wenlong,GAO Deli,YANG Jin,et al.Subsea wellhead stability study of composite casing for deepwater drilling[J].Ocean Engineering,2020,214:107780. [37] DENG Song,LIU Yali,JIANG Panglu,et al.Simulation and experimental study of deepwater subsea wellhead-shallow casing deflection considering system mass force[J].Ocean Engineering,2019,187:106222. [38] 邓嵩,耿浩然,赵虹宇,等.基于整体法的深水钻井隔水管-导管系统静态性能分析[J].能源工程,2019(4):13-21. DENG Song,GENG Haoran,ZHAO Hongyu,et al.Static performance analysis of riser-conductor system based on whole method in deep water drilling[J].Energy Engineering,2019(4):13-21. |