Editorial office of ACTA PETROLEI SINICA ›› 1987, Vol. 8 ›› Issue (2): 65-72.DOI: 10.7623/syxb198702009
• Oil Field Development • Previous Articles Next Articles
Kong Xiangyan
Received:
Online:
Published:
孔祥言
Abstract: In this paper,varying rat a production are studied using tlae concept of instantaneous ponit soiuce solutions.When the flow rates vary linearly with tune or were approximated by a cotmbina,tian of linear sections,this paper gives simple analytical formulas for pressure buildup test,ie;Eqs.(8)(10)(14)(15)(16) and Fig.3.In these Eqs.,Qodenotes the initial flow rates;Qs denotes the flow rate at shutin times;p the original reservcair pressure;and ts the shut-in time.
摘要: 本文由瞬时点源解的概念出发,研究了变产量情形的压力变化.对于产量随时间近似按线性变化,或者分段按线性变化的情形,给出了压力恢复分析的简单解析表达式.
Kong Xiangyan. PRESSURE ANALYSI IN CASE OF A LINEARLY VARIABLE RATE WELL TESTING [J]. Editorial office of ACTA PETROLEI SINICA, 1987, 8(2): 65-72.
孔祥言. 产量随时间按线性变化情形的压力分析[J]. 石油学报, 1987, 8(2): 65-72.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.syxb-cps.com.cn/EN/10.7623/syxb198702009
https://www.syxb-cps.com.cn/EN/Y1987/V8/I2/65