| [1]易发新,喻晨,李松滨,等.鱼刺分支水平井在稠油油藏中的应用[J].石油勘探与开发,2008,35(4):487-491.
 Yi Faxin,Yu Chen,Li Songbin,et al.Application of herringbone multilateral horizontal well in heavy oil reservoirs[J].Petroleum Exploration and Development,2008,35(4):487-491.
 
 [2]Baldini D,Tealdi L,Okassa F,et al.Multilateral wells to improve production performance in heavy-oil reservoirs:The challenges of the ZAM-408ML well[R].OTC 19451,2008.
 
 [3]Abouzar M P,Al-Anazi B D,Safian G A,et al.The role of multilateral drilling technology in increasing productivity in the middle east fields[R].SPE 125302,2009.
 
 [4]Lawrence B,Zimmerman M,Cuthbert A,et al.Multilateral wells reduce capex of offshore,subsea development in Australia’s northwest shelf[R].SPE 128314,2010.
 
 [5]范玉平,韩国庆.鱼骨井产能预测及分支井形态优化[J].石油学报,2006,27(4):101-104.
 
 Fan Yuping,Han Guoqing.Production forecast herringbone well and optimum configuration of lateral holes[J].Acta Petrolei Sinica,2006,27(4):101-104.
 
 [6]韩国庆,毛凤英,吴晓东,等.非对称鱼骨状分支井形态优化模型[J].石油学报,2009,30(1):92-95.
 
 Han Guoqing,Mao Fengying,Wu Xiaodong,et al.Optimization model for configuration of laterals in asymmetrical herringbone well[J].Acta Petrolei Sinica,2009,30(1):92-95.
 
 [7]王晓冬,于国栋,李治平.复杂分支水平井产能研究[J].石油勘探与开发,2006,33(6):729-733.
 
 Wang Xiaodong,Yu Guodong,Li Zhiping.Productivity of horizontal wells with complex branches[J].Petroleum Exploration and Development,2006,33(6):729-733.
 
 [8]张福东,吴晓东.煤层气羽状水平井的开采优化[J].天然气工业,2010,30(2):69-71.
 
 Zhang Fudong,Wu Xiaodong.Optimization of pinnate horizontal multilateral wells for coalbed gas recovery[J].Natural Gas Industry,2010,30(2):69-71.
 
 [9]李枝林,陈平,罗勇,等.分支井连接井段井眼力学特性的有限元分析[J].天然气工业,2006,26(2):80-83.
 
 Li Zhilin,Chen Ping,Luo Yong,et al.Finite element analysis of mechanical features for connecting section of branch hole[J].Natural Gas Industry,2006,26(2):80-83.
 
 [10]乔磊,申瑞臣,黄洪春,等.煤层气多分支水平井钻井工艺研究[J].石油学报,2007,28(3):112-115.
 
 Qiao Lei,Shen Ruichen,Huang Hongchun,et al.Drilling technology of multibranch horizontal well[J].Acta Petrolei Sinica,2007,28(3):112-115.
 
 [11]高德利,鲜保安.煤层气多分支井身结构设计模型研究[J].石油学报,2007,28(6):113-117.
 
 Gao Deli,Xian Bao’an.Research on design models of multi-lateral well structure for coal bed methane[J].Acta Petrolei Sinica,2007,28(6):113-117.
 
 [12]Hoang S,Abousleiman Y.The analytical solution for wellbore stability in multilateral junctions in nonhydrostatic in-situ stress field[R].SPE 90245,2004.
 
 [13]Lopez M A.Modeling of the stability of multilateral horizontal open holes[R].SPE 114117,2008.
 
 [14]Goodlow K,Huizenga  R.Multilateral completions in the Granite wash:Two case studies[R].SPE 120478,2009.
 |