石油学报 ›› 1981, Vol. 2 ›› Issue (3): 45-53.DOI: 10.7623/syxb198103006

• 油田开发 • 上一篇    下一篇

大庆油田注水开发全过程矿场试验

唐曾熊   

  1. 大庆油田
  • 收稿日期:1980-10-06 出版日期:1981-07-25 发布日期:2013-07-08

A FIELD PILOT TEST TO DEMONSTRATE THE WHOLE PROCESS OF WATER FLOODING IN THE DAQING OIL FIELD

Tang Zengxiong   

  1. Daqing Oil Field
  • Received:1980-10-06 Online:1981-07-25 Published:2013-07-08

摘要: 大庆油田是在六十年代初就全面实行早期注水保持压力开发的大型油田。由于其原油产量在相当长时间内在全国具有举足轻重的地位,所以,掌握油田注水开发全过程的生产特点和变化规律,预测注水采油的采收率,以指导编制油田长期生产规划,这是一项极为重要的任务。为此,除了进行油田地质、油层物理和渗流力学的研究和预测计算外,又在一九六五年以较小的井距进行了注水开发全过程的矿场试验。

Abstract: In order to get acquainted with the characteristics and changes of production by water flooding and to make predictions about its sweep efficiency, a field pilot test was conducted in 1965 in the Daqing oil field on a closespaced well pattern. The results of the test have been proved to be reliable by means of numerical simulation and core analysis. They are summarized in the following: 1. lower recovery-bbl/psi drop when the water cut is less than 60%, a steady output may be maintained if the reduction of the difference between bottom hole pressure and saturation pressure is gradual; 2. flowing production is suitable when the water cut is less than 60~70%; when water cut exceeds this limit, other means of production should be chosen on the basis of techno-economic analysis, and 3. the recovery factor by water drive in the Daqing oil field is 40%, the increase of water cut is rather rapid and the period of production with water cut is quite long.