[1]畅元江.深水钻井隔水管设计方法及其应用研究[D].东营:中国石油大学,2008.
Chang Yuanjiang.Design approach and its application for deepwater drilling risers[D].Dongying:China University of Petroleum, 2008.
[2]孙友义,陈国明.超深水钻井系统隔水管波致疲劳研究[J].石油学报,2009,30(3):460-464.
Sun Youyi,Chen Guoming.Research on wave-loading fatigue of drilling riser in ultra-deepwater drilling [J].Acta Petrolei Sinica, 2009,30(3):460-464.
[3]Brekke J N,Soles J,Wishahy M A,et al.Drilling riser management for a DP drillship in large,rapidly-developing seastates in deepwater:Proceedings of the 2004 IADC/SPE Drilling Conference,Dallas,March 2-4,2004[C].Dallas:SPE,2004.
[4]Steddum R.The management of long,suspended strings of tubulars from floating drilling vessels:Proceedings of the 2003 Offshore Technology Conference,Houston,May 5-8,2003[C].Houston:OTC,2003.
[5]Sullivan E O,Brekke J N,Dib M.Riser deployment and hang-off Analysis for a harsh environment:Proceedings of OMAE04 23rd International Conference on Offshore Mechanics and Arctic Engineering,Vancouver,June 20-25,2004[C].Vancouver:OMAE,2004.
[6]Kazuaki I,Kenkichi T,Katsuya M,et al.Behavior characteristics of hang off riser that considers oscillation of floating structure:Proceedings of OMAE2006 25th International Conference on Offshore Mechanics and Arctic Engineering,Hamburg,June 4-9,2006[C].Hamburg:OMAE,2006.
[7]Dai Wei,Gao Feng,Bai Yong.FEM analysis of deepwater drilling risers under the operability and hang-off working conditions[J].Journal of Marine Science and Application,2009,8(2):156-162.
[8]Ambrose B D,Grealish F,Whooley K.Soft hangoff method for drilling risers in ultra deepwater:Proceedings of the 2001 Offshore Technology Conference,Houston,April 30-May 3,2001[C].Houston:OTC,2001.
[9]Sparke C P.Fundamentals of marine risers mechanics[M].Tulsa:PennWell Corp,2007:199-203.
[10]American Petroleum Institute.API RP 16Q-1993 Recommended practice for design selection operation and maintenance of marine drilling riser system[S].Washington:American Petroleum Institute,1993.
[11]International Organization for Standardization.ISO 13624-1-2007 Petroleum and natural gas industries—Drilling and production equipment—Part 1:Design and operation of marine drilling riser equipment[S].Geneva:International Organization for Standardization,2007.
[12]孙友义.深水钻井隔水管强度评价方法及应用研究[D].东营:中国石油大学,2009.
Sun Youyi.Approach and application of strength assessment for deepwater drilling riser[D].Dongying:China University of Petroleum, 2009. |