[1] American Petroleum Institute.API RP 16Q-1993 Recommended practice for design,selection,operation and maintenance of marine drilling riser systems[S].Washington:American Petroleum Institute,1993.
[2] International Organization for Standardization.ISO 13624-1-2009 Petroleum and natural gas industries—Drilling and production equipment—Part 1:design and operation of marine drilling riser equipment[S].Geneva:International Organization for Standardization,2009.
[3] Hull M E,Rees J C,Deegan F J,et al.Risk-based case study of floating facility drilling riser design concepts in deepwater Gulf of Mexico:proceedings of the 2011 Offshore Technology Conference,Houston,May 2-5,2011[C].Houston:OTC,2011.
[4] Shen C L,Natarajan S.Conductor system fatigue excitation and mitigation:proceedings of the 20th International Offshore and Polar Engineering Conference,Beijing,June 20-25,2010[C].Cupertino:ISOPE,2010.
[5] 孙友义,鞠少栋,蒋世全,等.超深水钻井隔水管-井口系统涡激振动疲劳分析[J].石油学报,2011,32(6):1050-1054.
Sun Youyi,Ju Shaodong,Jiang Shiquan,et al.Fatigue analysis of the vortex-induced vibration in a drilling riser-wellhead system in ultra deepwater[J].Acta Petrolei Sinica,2011,32(6):1050-1054.
[6] 畅元江,陈国明,刘健.深水钻井隔水管的波致长期疲劳[J].机械强度,2009,31(5):797-802.
Chang Yuanjiang,Chen Guoming,Liu Jian.Long-term wave fatigue analysis of deepwater drilling riser[J].Journal of Mechanical Strength,2009,31(5):797-802.
[7] 孙友义,陈国明.超深水钻井系统隔水管波致疲劳研究[J].石油学报,2009,30(3):460-464.
Sun Youyi,Chen Guoming.Research on wave-loading fatigue of drilling riser in ultra-deep water drilling[J].Acta Petrolei Sinica,2009,30(3):460-464.
[8] 刘秀全,陈国明,畅元江,等.深水钻井隔水管时域随机波激疲劳分析[J].中国石油大学学报:自然科学版,2012,36(2):146-151.
Liu Xiuquan,Chen Guoming,Chang Yuanjiang,et al.Time domain random wave-loading fatigue analysis on deepwater drilling risers[J].Journal of China University of Petroleum:Edition of Natural Science,2012,36(2):146-151.
[9] Khan R A,Ahmad S.Dynamic response and fatigue reliability analysis of marine riser under random loads:proceedings of 26th International Conference on Offshore Mechanics and Arctic Engineering,San Diego,June 10-15,2007[C].Houston:OMAE,2007.
[10] Steinkjer O,Sodahl N,Grytoyr G.Method for time domain fatigue life assessment of risers and umbilicals:proceedings of 29th International Conference on Offshore Mechanics and Arctic Engineering,Shanghai,June 6-11,2010[C].Houston:OMAE,2010.
[11] 李华桂.海洋钻井隔水管的动力分析[J].石油学报,1996,17(1):122-127.
Li Huagui.Dynamic analysis of offshore drilling riser[J].Acta Petrolei Sinica,1996,17(1):122-127.
[12] American Petroleum Institute.API RP 2A-WSD-2000 Recommended practice for planning,design and constructing fixed offshore platforms:working stress design[S].Washington:American Petroleum Institute,2000.
[13] American Society for Testing and Materials.ASTM E1049-85-2005 Standard practices for cycle counting in fatigue analysis[S].West Conshohocken:American Society for Testing and Materials,2005.
[14] 刘健,陈国明,黄东升.冰区海洋平台疲劳可靠性评估方法的研究[J].石油学报,2006,27(5):115-123.
Liu Jian,Chen Guoming,Huang Dongsheng.Evaluation method for fatigue reliability of offshore platform in ice region[J].Acta Petrolei Sinica,2006,27(5):115-123.
[15] 许亮斌,陈国明.考虑疲劳失效的海洋平台动态可靠性分析[J].石油学报,2007,28(3):131-134.
Xu Liangbin,Chen Guoming.Dynamic reliability analysis of offshore platform considering fatigue failure[J].Acta Petrolei Sinica,2007,28(3):131-134.
[16] 鞠少栋,畅元江,陈国明,等.超深水钻井作业隔水管顶张力确定方法[J].海洋工程,2011,29(1):100-104.
Ju Shaodong,Chang Yuanjiang,Chen Guoming,et al.Determination methods for the top tension of ultradeepwater drilling risers[J].The Ocean Engineering,2011,29(1):100-104.
[17] Chang Yuanjiang,Chen Guoming,Sun Youyi,et al.Nonlinear dynamic analysis of deepwater drilling risers subjected to random loads[J].China Ocean Engineering,2008,22(4):683-691.
[18] Det Norske Veritas.DNV-RP-C203-2001 Fatigue strength analysis of offshore steel structures[S].Oslo:Det Norske Veritas,2001. |