[1] 王明波,郭亚亮,方明君,等.裂缝性地层钻井液漏失动力学模拟及规律[J].石油学报,2017,38(5):597-606.
WANG Mingbo,GUO Yaliang,FANG Mingjun,et al.Dynamics simulation and laws of drilling fluid loss in fractured formations[J].Acta Petrolei Sinica,2017,38(5):597-606.
[2] 中国石油天然气集团公司工程技术与市场部,中国石油天然气集团公司石油工程技术承包商协会.中国石油天然气集团公司井喷事故案例汇编[M].北京:石油工业出版社,2006.
China Petroleum and Natural Gas Corporation Engineering and Marketing Department,China Petroleum and Natural Gas Corporation Petroleum Engineering and Technology Contractor Association.China petroleum and natural gas corporation blowout accident case compilation[M].Beijing:Petroleum Industry Press,2006.
[3] 卓鲁斌,葛云华,汪海阁.深水钻井早期井涌检测方法及其未来趋势[J].石油钻采工艺,2009,31(1):22-26.
ZHUO Lubin,GE Yunhua,WANG Haige.Early kick detection methods for deepwater drilling and its future development[J].Petroleum Drilling & Production Technology, 2009,31(1):22-26.
[4] 陈庭根,管志川.钻井工程理论与技术[M].东营:石油大学出版社,2000.
CHEN Tinggen,GUAN Zhichuan.Drilling engineering theory and technology[M].Dongying:Petroleum University Press,2000.
[5] 李相方,管丛笑,隋秀香,等.气侵检测技术的研究[J].天然气工业,1995,15(4):19-22.
LI Xiangfang,GUAN Congxiao,SUI Xiuxiang,et al.Research on gas cut detecting technology[J].Natural Gas Industry,1995,15(4):19-22.
[6] 任美鹏,李相方,刘书杰,等.深水钻井井筒气液两相溢流特征及其识别方法[J].工程热物理学报,2011,32(12):2068-2072.
REN Meipeng,LI Xiangfang,LIU Shujie,et al.The characteristics and identification method of gas-liquid two flow overflow in deepwater drilling[J].Journal of Engineering Thermophysics,2011,32(12):2068-2072.
[7] Nas S.Kick detection and well control in a closed wellbore[R].SPE 143099,2011.
[8] Tseytlin S.Methods and devices for determination of gas-kick parameters and prevention of well explosion[R].SPE 166871,2013.
[9] 徐加放,丁廷稷,张瑞,等.水基钻井液低温流变性调控用温敏聚合物研制及性能评价[J].石油学报,2018,39(5):597-603.
XU Jiafang,DING Tingji,ZHANG Rui,et al.Development and performance evaluation of thermo-sensitive polymer for low-temperature rheology control of water-based drilling fluid[J].Acta Petrolei Sinica,2018,39(5):597-603.
[10] 徐春露,孙建孟,董旭,等.页岩气储层孔隙压力测井预测新方法[J].石油学报,2017,38(6):666-676.
XU Chunlu,SUN Jianmeng,DONG Xu,et al.A new pore pressure logging prediction method in shale gas reservoirs[J].Acta Petrolei Sinica,2017,38(6):666-676.
[11] GE Zhiqiang,SONG Zhihua,GAO Furong.Review of recent research on data-based process monitoring[J].Industrial & Engineering Chemistry Research,2013,52(10):3543-3562.
[12] QIN S J.Survey on data-driven industrial process monitoring and diagnosis[J].Annual Reviews in Control,2012,36(2):220-234.
[13] ZHANG Yingwei,ZHANG Yang.Process monitoring,fault diagnosis and quality prediction methods based on the multivariate statistical techniques[J].IETE Technical Review,2010,27(5):406-420.
[14] CHO Y M,RAJAMANI R.A systematic approach to adaptive observer synthesis for nonlinear systems[J].IEEE Transactions on Automatic Control,1997,42(4):534-537.
[15] BESANÇON G.Remarks on nonlinear adaptive observer design[J].Systems & Control Letters,2000,41(4):271-280.
[16] ZHOU J,STAMNES O N,AAMOL O M,et al.Observer-based control of a managed pressure drilling system[C]//2008 Chinese Control and Decision Conference.Yantai,Shandong,China:IEEE,2008:3475-3480.
[17] ZHANG Q.Adaptive observer for multiple-input-multiple-output (MIMO)linear time-varying systems[J].IEEE Transactions on Automatic Control,2002,47(3):525-529.
[18] XU Aiping,ZHANG Qinghua.Nonlinear system fault diagnosis based on adaptive estimation[M].Tarrytown,NY,USA:Pergamon Press,Inc.,2004.
[19] 郭江维,缑林峰,时培燕,等.基于自适应观测器的故障检测方法研究[J].计算机仿真,2014,31(2):136-139.
GUO Jiangwei,GOU Linfeng,SHI Peiyan,et al.Research on fault detection method based on adaptive observer[J].Computer Simulation,2014,31(2):136-139.
[20] LEE J M,YOO C K,LEE I B.Statistical process monitoring with independent component analysis[J].Process Control,2004,14(5):467-485.
[21] 陈国金,梁军,钱积新.独立元分析方法(ICA)及其在化工过程监控和故障诊断中的应用[J].化工学报,2003,54(10):1474-1477.
CHEN Guojin,LIANG Jun,QIAN Jixin.ICA and its application to chemical process monitoring and fault diagnosis[J].Journal of Chemical Industry and Engineering (China),2003,54(10):1474-1477.
[22] 陆宁云,王磊,姜斌.基于时延SDG和ICA的多工况过程故障预测方法[J].控制工程,2011,18(4):632-635.
LU Ningyun,WANG Lei,JIANG Bin.A fault prognosis method based on time-delayed SDG and ICA for multi-mode industrial processes[J].Control Engineering of China,2011,18(4):632-635.
[23] 邓晓刚,徐莹.基于贝叶斯ICA的多工况非高斯过程故障检测[J].控制工程,2018,25(3):402-407.
DENG Xiaogang,XU Ying.Multimode non-gaussian process fault detection based on Bayesian-ICA[J].Control Engineering of China,2018,25(3):402-407.
[24] GODHAVN J M.Control requirements for high-end automatic MPD operations[R].SPE 119442,2009.
[25] KAASA G O.A simple dynamic model of drilling for control[R].Porsgrunn:StatoilHydro Research Centre,2007.
[26] 王果,范红康,牛新明,等.控压钻井线性节流阀及其控制[J].石油学报,2017,38(8):105-112.
WANG Guo,FAN Hongkang,NIU Xinming,et al.Linear choke valve and its control technology for managed pressure drilling[J].Acta Petrolei Sinica,2017,38(8):105-112.
[27] NYGAARD O G H.Multivariable process control in high temperature and high pressure environment using non-intrusive multi sensor data fusion[D]. Trondheim Norway:Norwegian University of Science and Technology,2006.
[28] XU Aiping,ZHANG Qinghua.Nonlinear system fault diagnosis based on adaptive estimation[J].Automatica,2004,40(7):1181-1193.
[29] FARZA M,M'SAAD M,MAATOUG T,et al.Adaptive observers for nonlinearly parameterized class of nonlinear systems[J].Automatica,2009,45(10):2292-2299.
[30] HYVÄRINEN A,HURRI J,HOYER P O.Independent component analysis[M]//Natural Image Statistics.London:Springer,2009:529-529.
[31] KANO M,HASEBE S,HASHIMOTO I,et al.Evolution of multivariate statistical process control:application of independent component analysis and external analysis[J].Computers & Chemical Engineering,2004,28(6/7):1157-1166.
[32] 周照明.欠平衡随钻气侵规律及运移模型研究[D].大庆:东北石油大学,2010.
ZHOU Zhaoming.Study of gas kick rule and migration model during underblance drilling[D].Daqing:Northeast Petroleum University,2010.
[33] 白丽丽,孙文峰,高金兰,等.基于多参数控制的钻井事故监测预警系统[J].化工自动化及仪表,2017,44(7):643-647.
BAI Lili,SUN Wenfeng,GAO Jinlan,et al.Drilling accident monitoring and early-warning system based on multi-parameter control[J].Chemical and Automations in Chemical Industry,2017,44(7):643-647. |